If you have been following along with us, we have been blogging about the set design for our upcoming production of Annapurna.
You can read the first part of the story right here.
Check out this time lapse video and watch the set being built at the theatre in under a minute. These photographs span a few days of work and you can see the entire trailer being assembled on stage with laminate flooring, carpet, cabinetry, and a hanging ceiling.
Pretty cool huh?
Inside scoop: All of the lights and appliances work. The sink really runs water and the refrigerator is keeping drinks cold already.
Keep following along, we will post more behind the scenes footage as the props designer gets in on the action! We are also going to interview the actors and we will post that here as well.
Ready to get your tickets? Click here.